The driveway in front of the Conestoga Skilled Trades Campus on Reuter Drive in Cambridge is changing back to one-way traffic in order to implement a pedestrian walkway. These changes will remain in place for the duration of Phase 2 construction into summer 2026.
A power outage is scheduled for Saturday, June 6, from 6 a.m. to 5 p.m., affecting all buildings. There will be no entry to the buildings; emergency power will remain operational throughout the shutdown.
High-voltage preventive maintenance is scheduled for the Conestoga Skilled Trades Campus on Reuter Drive in Cambridge on Sunday, May 3, 2026, from 6 a.m. to 5 p.m. There will be no entry to the building, and no classes or activities will take place. Power will be turned off, with emergency power remaining operational.
All library locations will be closed on Tuesday, May 5, for a staff planning day. Regular hours and services will resume on Wednesday, May 6. AskOn – an online chat service that provides quick research and account support – remains available at its regular hours (https://library.conestogac.on.ca/).
Gas service to the Student Recreation Centre (SRC) and Toyota Power Engineering Complex (TPEC) will remain interrupted until further notice. Additional updates will be shared here as they become available.