Construction is scheduled for the Waterloo campus at 108 University Ave. East, from Monday, November 13, 2023, to Tuesday, December 31, 2024. During this time, Waterloo Main Building Level 1 of the D- and E-Wings, part of the Level 1 B-Wing, the west parking lot, the north laneway and the former Sonny’s property will be closed.
The second-floor washrooms of the Kitchener - Doon campus Welcome Centre will be closed from Friday, April 12, to Friday, August 30, 2024, for renovations. Ground floor washrooms will remain operational during this time.
The central parking lot at the Cambridge - Reuter Drive (Skilled Trades) campus will be closed from Monday, April 22, to Monday, September 2, 2024. The east parking lot will remain open, and a pedestrian walkway will be available. Accessible parking will be available in the west parking lot.
Parking lots 4 & 5 at the Kitchener - Doon campus will be closed from Monday, June 17, to Friday, June 21, 2024, due to maintenance work in the area.
Vehicle traffic around the closed central parking lot will be redirected to a temporary roadway, and the pedestrian walkway will shift to the north side of the closed parking lot from Monday, June 17, to Monday, June 24.