IT Services Status

Teams
Student Portal
Internet
Zoom
Email
eConestoga
SIS / Employee Portal
Corporate Website
Wi-Fi
Azure Virtual Desktops
OneDrive / SharePoint Online
Other
Online Issues Offline

Apps and tools


IT Services Status

Teams
Student Portal
Internet
Zoom
Email
eConestoga
SIS / Employee Portal
Corporate Website
Wi-Fi
Azure Virtual Desktops
OneDrive / SharePoint Online
Other
Online Issues Offline

College Service Updates


Waterloo campus construction: November 13, 2023, to December 31, 2024

Construction is scheduled for the Waterloo campus at 108 University Ave. East, from Monday, November 13, 2023, to Tuesday, December 31, 2024. During this time, Waterloo Main Building Level 1 of the D- and E-Wings, part of the Level 1 B-Wing, the west parking lot, the north laneway and the former Sonny’s property will be closed.


Kitchener - Doon campus Welcome Centre washroom closed: April 12 to August 30, 2024

The second-floor washrooms of the Kitchener - Doon campus Welcome Centre will be closed from Friday, April 12, to Friday, August 30, 2024, for renovations. Ground floor washrooms will remain operational during this time.


Cambridge - Reuter Drive (Skilled Trades) campus central parking lot closed: April 22 to September 3, 2024

The central parking lot at the Cambridge - Reuter Drive (Skilled Trades) campus will be closed from Monday, April 22, to Monday, September 2, 2024. The east parking lot will remain open, and a pedestrian walkway will be available. Accessible parking will be available in the west parking lot.


Kitchener - Doon campus parking lots 4 and 5 closed: June 17 to 21, 2024

Parking lots 4 & 5 at the Kitchener - Doon campus will be closed from Monday, June 17, to Friday, June 21, 2024, due to maintenance work in the area.


Cambridge - Reuter Dr. (Skilled Trades) campus central parking lot vehicle traffic and pedestrian walkway changes: June 17 to 24, 2024

Vehicle traffic around the closed central parking lot will be redirected to a temporary roadway, and the pedestrian walkway will shift to the north side of the closed parking lot from Monday, June 17, to Monday, June 24.